Cementos del Cairo S.A. – 2003

INSTALLING OF MILL NO. 6

PROBLEM

Cement grinding systems had a very high cost and its technology was outdated.

SOLUTION

Dismantling, installment and transfer of a ball mill installed in the Argos Plant in Medellin, followed by its installing with the latest cutting edge technology.

RESULTS:

Cement manufacturing at a lower cost, reduction of pollution and higher rate of equipment availability.