Cementos Argos S.A. Ríoclaro Plant – 2010

HEAD WALL AND END WALL REPLACEMENT – MILL NO.4

Problem

Trunnion had cracks in the Mill, which affected the optimal operation of the equipment and its transmission system.

Solution

Change the ends of the cement mill #4.

Result

Optimizing achievement ensuring their alignment equipment within the allowable minimum parameters according to technical standards tables and equipment manufacturer.