Cementos Argos Argos S.A. Planta Ríoclaro – 2012

HEAD WALL AND END WALL REPLACEMENT RAW MILL LINE 1

Problem

Due to leaks of cement in the Mill Shell, there is a cement entrance in the lubrication system of the mill. This cement produce wear on the mill Trunnion, which requires to make a change.

Solution

Replace the head and end wall of the mill.

Results

Normal vibration levels in the motor system. Low temperature in lubrication systems and high driving factors of the mill.