PROJECTS IN THE CEMENT INDUSTRY

Cementos Argos S.A.
Sogamoso Plant - 2011

Replacement of the ball mill Trunnion No. 1

PROBLEM: The old ball mill Trunnion was fissured, by this reason the hood was misaligned, and this was causing the deterioration of it. As well the grinding media of the mill was worn.
SOLUTION: Dismantling and assembly of the new ball mill Trunnion.
RESULTS: New grinding media to the load of the ball mill, a new ball mill Trunnion without fissures and the alignment of the hood and the optimization of the cement grinding process.

Holcim S.A.
Nobsa Plant - 2011

Maintenance of the ATTOX raw mill

PROBLEM: there was wear on the bearings of the ATTOX raw mill rollers and increased the oil consumption of the rollers, and this was generating shots in the lubrication unit.
SOLUTION: Assembly of the new bearings, replacement of retainers and repair of the rollers to minimize the oil consumption and continue with the normal operation of the mill.
RESULTS: New bearings and retainers to the raw mill rollers, decrease of the oil consumption and a normal operation of the mill.

Holcim S.A.
Nobsa Plant - 2011

Replacement of the cyclone dip tube No. 3

PROBLEM: The cyclone dip tube No. 3 was worn because of the temperature and then it lose all of this duct and this created problems of fake air inside the cyclone.
SOLUTION: Assembly of the new dip tube original in stainless steel according to the design of FLSmidth.
RESULTS: Optimization of the process, taking again to normal operation and to the appropriated temperature the preheating system in the cyclones.

Cementos Argos S.A.
Tolu Viejo Plant - 2011

Ferrule wheel replacement 2, Civil labor and kiln

PROBLEM: The ferrule was fissured on the wheel No. 2 and the kiln was misalignment.
SOLUTION:Replacement of 2 ferrules, 6 and 12 feet long on the run down area.
RESULTS: Alignment kiln and shell in good conditions to its production labor.

Vensur N.T
Paramaribo Plant, Surinam

Replacement of the metallic lining

PROBLEM: Low production efficiency
SOLUTION: Replacement of intermediate and output partitions and lining.
RESULTS: Increased production by 15%.

Cementos Argos S.A.
Sogamoso Plant

Repair in the Cement Kiln

PROBLEM: Between ferrules 18 and 19 there were partial fissures in the union with profundity of 70% of it thickness.
SOLUTION: Repair by welding procedure.
RESULTS: At the end of the project there werenít fissures and that was checked with an ultrasonic with satisfactory results. .

Vensur N.T
Paramaribo Plant, Surinam - 2011

Assembly System Cement Mill dedusting

PROBLEM: Deficiencies in the cement mill by an obsolete collector system, dedusting duct separator
SOLUTION: Manufacture and installation of dedusting duct for the new dust collector. New mill and separator increasing its production of 14 ton in 18 ton hours hours
RESULTS: A new dedusting system for cement mill and reduced pollution and dust to the environment.


Cementos Argos S.A.
Sabanagrande Planta - 2011

Replacement of the Renk Kjav 112 Reducer Bearings of the Drive System raw mill. Replacement of coal mill drop hammer. Maintenance of raw mill. Maintenance of Kiln No. 1

PROBLEM: The useful life of the reducer bearing was over, and raw and coal mill equipment were deteriorated on their coverings. Reliability of the furnace was decreasing.
SOLUTION: General repair of the reducer, the raw and coal mill and preventive maintenance of the kiln.
RESULTS: equipment working with high reliability and performance in its production.


Cementos Argos S.A.
Yumbo Plant - 2011

Replacement of the filter emplaced, 5000 hour maintenance of the electro-filter and 5000 hours maintenance of the kiln

PROBLEM: Environmental pollution
SOLUTION: Replacement of plates and electrodes of the field D, F, E of the electrostatic filter.
RESULTS: Reduction of environmental emissions.


Cementos Argos S.A.
Yumbo Plant - 2011

Allis Chalmers Maintenance

PROBLEM: Loose Plates Bowl.
SOLUTION: Replacement of the epoxy mounting plate.
RESULTS: Ensure the machine work for next two years without problems on the plates of the bowl.